33
The 7 following technical points must be completed at your customer s premises for a successful installation:
A dedicated cold water rising main water supply, within 2 meters of the cooling unit.
A dedicated 13A switched electrical power socket (no extension leads) located within 2 meters of the cooling unit (cord length)
A water drain is recommended
A well ventilated room with a temperature below 30 degrees
Accessibility to the installation room: if not on the ground floor/in a basement, presence of a lift or a staircase wide enough to deliver the cooling unit
Ductwork safely accessible for the technician, to run python from the cooler to the dispense head
Compliance with the space constraint around the cabinet: + 20cm on the left for the CO2 cylinder + 1m in front of the cabinet for technical operations and replacing the BIB.
Standard Bag in box rack cabinet dimensions (without cooling unit): W680 x D440 x H720
Standard Bag in box rack cabinet dimensions (with cooling unit): W680 x D440 x H1500
ABOUT OUR POSTMIX
GOOD TO KNOW drilling of the walls to run the duct between the cooling unit/technical room and the dispenser/bar gun is under the responsibility of the customer.