• Contents
  • Full Screen
  • Switch off the sound
  • Switch on the sound
  • Powered by Fluidbook
Your browser is not up to date and is not able to run this publication.

4

PRE-OPENING ROUTINE

Following some quick and easy steps every day before opening will ensure your customers will receive a quality drink every time.

1 POSTMIX SYSTEM Clean your postmix system (see instructions p.6).

2 SYRUP Check your syrup BIBs to ensure they are not empty and are within best before dates. (see instructions p.10 to change BIB).

3 C02 Check your CO2 supply gauge. If at the bottom of the red segment, change the gas bottle as described on page 12.

4 TEMPERATURE Dispense a drink and check the temperature with a thermometer. It should be 5 °C or less.

5 TASTE Taste the drink. Make sure the carbonation is good (the drink is fizzy) and the dilution is correct (it doesn t taste weak or strong).

DAILY CHECK

CCEP - Daily cleaning instructions for PostmixCCEP - Daily cleaning instructions for PostmixCCEP - Daily cleaning instructions for PostmixDAILY CHECKWEEKLY CHECKVALVEVALVEBAR GUNBAR GUN3. CHANGING THE BAG-IN-BOX3. CHANGING THE BAG-IN-BOX4. CHANGING THE CO2 CYLINDER4. CHANGING THE CO2 CYLINDER4. CHANGING THE CO2 CYLINDER
Menu

Tap twice or spread your fingers to zoom in

Ctrl++
Ctrl+–

Zoom in and zoom out

Click once to zoom in, click again to zoom out
Roll the mouse wheel to zoom in/out

Ctrl+F
Search
F2
Contents
F11
Switch between fullscreen and normal
F10
Switch on / switch off the sound
F10
Switch on / switch off the sound
Next double page
PageDown
Last page
End
PageUp
Previous double page
Home
Frontpage
Drag handle to switch page
Powered by Fluidbook
Close menu