Click here to download this quiz on what checks you should make both before and after choosing a contractor
If high value or long lead time equipment is installed before piping systems are tested and monitored, is adequate protection in place?
Conduct a work area risk assessment with a clear water damage response plan and equipment nearby in case a leak occurs.
Carry out regular inspections throughout the day and all work coordinated with building owner or facilities manager. Are there any sprinklers that may be affected? If so, a fire watch may be required.
Make a final check at the end of the working day to ensure the system is either closed or reinstated for use.