Preparing for

our transition

to a combined EPR

scheme was an extremely

ambitious project, involving

dozens of sub-projects

that had to be tackled

simultaneously. We consulted

a wide range of stakeholders

to fill in the gaps in our

knowledge so that the right

decisions could be made.

This dynamic was based on

collective intelligence: each

internal team contributed

its expertise at key moments,

and each partner

played ball to ensure

a smooth transition.”

EXPERT VIEW

NIKOLA DIZDAR

Project Manager CYCLEVIA

33 32 CYCLEVIA

2024 ANNUAL REPORT

To successfully move to a com-

bined EPR scheme, CYCLEVIA mo-

bilised the OTC, bringing together

the local stakeholders (collection

operators, regeneration opera-

tors, etc.). The f ive sessions in 2024

enabled the lots of the future invita-

tion to tender to be geographically

divided up allowed healthy competition to be maintained

and key questions to be resolved including the metrology

What was the aim of this To establish realistic demanding

and practical specif ications The technical choices made set

a precise framework to divide the lots up fairly and ensure

traceability in the quantities collected Operational feedback

was used to hone measuring and monitoring methods and

ensure they followed real practices to avoid any risks of being

disconnected from reality

All the methods and tools used to accurately measure the quantities collected

and treated

An Operational Technical Committee

to lay the groundwork

for the transition

From funder to operator,

CYCLEVIA is about to change scale and take on a new

role. In 2025, in addition to its purely f inancial activity,

the producer responsibility organisation will take

on operational responsibilities, within the context

of its move to a combined EPR scheme, when it launches

its own waste oil collection and recycling solution. To

successfully complete this structuring transition, CYCLEVIA

co-built each project phase by consulting the industry’s

stakeholders which involved mobilising the Operational

Technical Committee (OTC), and specialised working

groups, upstream to the invitation to tender ensuring that

the existing balance in the market is maintained and that

collection is exemplary everywhere in mainland France.

moving to a combined EPR scheme,

a major turning point for CYCLEVIA

f

o

c

u

s

o

n

MOVE TO A COMBINED EPR SCHEME

Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024Cyclevia Annual Report 2024
Powered by Fluidbook