Client
Prime Properties
Location
Montreal, Quebec
Delivery
2019 2021
Contract type
Design-build
Challenges
Build in a confined area in one of downtown s busiest sectors.
Optimize thermal performance given the building s broad balconies and windowed surfaces.
Solutions
Carry out 3D modeling of the 2D architectural plans, and share the detailed information with the trade partners through the BIM process.
Employ an integrated design process (IDP) to allow the client, managers, architects, engineers, consultants and trade partners to work together from the initial planning phase.
Perform laser scanning of the metro line, pedestrian tunnels and utility services in the area, and use the data collected to build a 3D model to prevent any conflict with this existing infrastructure and optimize the foundations.
Hire waterproofing experts for work on the vertical enve- lope and roof. Use a new generation of structural ther- mal breaks to reduce energy loss by 90%, offer better comfort to occupants and eliminate the formation of condensation and mold.
A new commercial and residential building in the heart of the city
ACHIEVEMENTS SECTION
58