Spotlight on :
OptiPort Inland Scheduling
InnoWaTr Centre of Expertise
80
OptiPort Inland Scheduling is an AI - driven planning and
optimization tool that automatically creates and updates
schedules for pushers and barges . It takes into account vessel
positions , transportation requests , crew work hours and regulations ,
lock and bridge opening times and dimensions , tides , currents ,
charging network and battery levels and weather conditions , all
combined into one operational optimization model .
OptiPort is connected to FFC 4 - Dutch Freight Flow Coalition
“ In a multi - client situation , a push - barge concept can reap its in - built flexibility
with an optimized deployment schedule ” , this is how Mats Poppe Junior Product
Owner at KoTug boils down the benefits of OptiPort . “ We aim to think inland
waterway transport “ as a service ” by integrating the asset concept of the E -
Pusher with data - driven optimization and multiple fuel - options for the client .
Mats Poppe ( KOTUG )
Meet and greet the expert :
Mats Poppe
Junior Product Owner
m poppe@kotug com
www kotug com
AI - driven planning and optimization for tug deployment
The result is a continuously optimized
schedule that reduces waiting times ,
improves fleet utilization , fuel / energy
consumption and ensures reliable
execution under real - world conditions . A
GANTT - chart shows for each vessel the next
deployments including ( de - ) mobilization
times .
Job time
Mobilisation time
Demobilisation time
Real - time data sources
Back to
Tools
